欧美日韩永久久一区二区三区-欧美日韩有码-欧美日韩在大午夜爽爽影院-欧美日韩在线播放-欧美日韩在线播放一区二区三区-欧美日韩在线播一区二区三区

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 久久爱www. | 中文日韩字幕一区在线观看 | 久久亚洲国产中v天仙www | 91露出 | 亚洲欧洲精品久久 | 日本在线一卡二卡毛片 | 成视频年人黄网站免费 | 四虎成人国产精品视频 | 日本免费一区二区三区毛片 | 可播放的欧美男男videos | 91福利一区二区在线观看 | 日韩在线高清视频 | 免费在线成人网 | 欧美日韩精品福利在线观看 | 视频在线一区二区 | 久久久中文 | 免费嗨片 | 色吊丝4| 天天好比 | 国产亚洲片 | 久久中文亚洲国产 | 久久大香伊蕉在人线观看热2 | 最新版资源在线天堂 | 天天碰天天 | 久久久在线视频精品免费观看 | 亚洲在线视频观看 | 成人午夜视频在线观看 | a视频在线观看免费 | 欧美激情不卡 | 婷婷丁香色综合图亚洲 | 国产精品欧美日韩 | 三级在线观看国产 | 国产综合激情在线亚洲第一页 | 久久精品国产99国产精偷 | 亚洲精品在线免费看 | 日日夜夜操操 | 亚洲一区毛片 | 国产日产欧产精品网站 | 婷婷综合五月中文字幕欧美 | 日韩色视 | 久久久精品久久久久三级 |